Electric demand may triple, but resistance to power generation is growing, too. The two are on a collision course.
The Mountain Valley Pipeline took a decade to build and was challenged all along the way by lawsuits and the occasional protester chained to a bulldozer or camped out in a tree. Across rural Virginia, opposition to solar energy projects is rising and some …